| 1974 |
|
| |
Allied established in Vancouver, BC. |
| 1980 |
|
| |
High-pressure material conveying systems offered. |
| 1984 |
|
| |
Designed, manufactured and installed first mill-wide greenfield OSB plant dust extraction system. |
| 1986 |
|
| |
Established a fabrication facility in Edmonton, AB. |
| 1986 |
|
| |
Established a fabrication facility in Williams Lake, BC |
| 1988 |
|
| |
Moved our head office into a new fabrication facility in Surrey, B.C.
Sales office opened in Kelowna, BC. |
| 1990 |
|
| |
Technology agreement signed to develop premium baghouse filter technology applications.
Acquired a competing Vancouver-based firm and established a sales office on Vancouver Island. |
| 1993 |
|
| |
Technology agreement signed with GreCon, Inc. for spark detection systems used in dust collection systems. |
| 1995 |
|
| |
Purchased manufacturing facility in Acheson, AB. |
| 1997 |
|
| |
Technology agreement made with Albarrie Inc. for distribution of fabric filter bags in western Canada and in the northwestern United States. |
| 1998 |
|
| |
Entered the waste wood energy business. Designed, fabricated and installed system at Pope & Talbot’s Castlegar, BC sawmill. Installed a Regenerative Thermal Oxidizer (‘RTO’) in an asphalt shingle plant in Alberta. |
| 1999 |
|
| |
Purchased assets of a competitor in Vernon, B.C. and established a fabrication and sales facility. |
| 2001 |
|
| |
In co-operation with Geoenergy Inc Allied sold a wet electrostatic precipitator (WESP) turnkey system in Williams Lake, BC.
ABGG Technologies (a joint venture company with Geoenergy and APIGI) established in Quebec City, QC. |
| 2002 |
|
| |
Dust collection system for coal burning utility power plant designed fabricated and installed at EPCOR Power in Edmonton. |
| 2004 |
|
| |
Supplied and installed dust collection ducting to Potash Corporation in Saskatchewan.
Shareholding in ABGG to 50%. |
| 2005 |
|
| |
Technology agreement signed with Eisenmann for sales of gas cleaning technologies (RTO’s and wet electrostatic precipitators). |
| 2009 |
|
| |
50% ownership position in ABGG sold. |
| 2010 |
|
| |
Opened fifth sales & service centre in Prince Albert, Saskatchewan. |
| 2011 |
|
| |
Awarded contract for supply of all process and HVAC air systems for greenfield OSB plant in Russia.
|